FY 2022/23 Surface Seal Project

In general, the work consists of surface seals and base repairs on various streets in the City of Martinez. The work includes, but is not limited to the following: Preparing pavement surfaces to receive surface seals; removing existing thermoplastic traffic striping, legends, and markers, performing HMA base repairs; adjustment of utility covers; maintaining traffic and furnishing traffic control throughout construction; applying crack sealant; applying slurry seals and cape seals over the existing pavement surfaces of various streets; constructing PCC curb ramps; street sweeping; installing new traffic striping, legends, and pavement markers; placing blue reflective pavement markers; and all appurtenant work required to complete the project in accordance with the project’s plans and specifications.