2022 Rankin Aquatic Center Equipment Replacement

In general, the work includes the partial replacement of the swimming pool equipment at the Rankin Aquatic Center in the City of Martinez. The work includes, but is not limited to the following: Demolition and replacement of the existing Competition Pool and Recreation Pool heaters and VFD’s. Rebuilding all filter backwash valves. Replacing existing CO2 feeders with pH MTS mass transfer systems for each pool. Demolishing and replacing an existing pump in the pump pit and re-waterproofing the sump. All electrical work and all appurtenant work required to complete the project in accordance with the project’s plans and specifications.
Addendum 1 (click to expand/collapse)
Name Size
BidAdd#1_CityOfMartinez_C5044 130.2 KB
Addendum 2 (click to expand/collapse)
Name Size
BidAdd#2_CityOfMartinez_C5044 118.9 KB
Addendum 3 (click to expand/collapse)
Name Size
BidAdd#3_CityOfMartinez_C5044 161.8 KB